9Provisional orders
Where the Inspector reports the case of any boiler to the Chief Inspector under sub-section (3) of section 7 1*** he may, if the boiler is not a boiler the use of which has been prohibited under clause (f) of sub-section (1) of section 8, grant to the owner thereof a provisional order in writing permitting the boiler to be used at a pressure not exceeding such maximum pressure as he thinks fit and as is in accordance with the regulations made under the Act pending the receipt of the orders of the Chief Inspector. Such provisional order shall cease to be in force--
(a) on the expiry of six months from the date on which it is granted, or
(b) on receipt of the orders of the Chief Inspector, or
(c) in any of the cases referred to in clauses (b), (c), (d), (e) and (f) of sub-section (1) of section 8.
and on so ceasing to be in force shall be surrendered to the Inspector.
Download our fully-offline, High speed android app.- Click here
1. The words, brackets and figures "or sub-section (5) of section 8" omitted by Act 49 of 2007, s.10 (w.e.f. 27-5-2008).
- 1 Short title, extent and commencement
- 2 Definitions
- 2A Application of Act to feed-pipes
- 2B Application of Act to economisers
- 3 Limitation of Application
- 4 Power to limit extent
- 4A Technical Adviser
- 4B Welders certificate
- 4C Conditions precedent for manufacture of boiler land boiler componen
- 4D Inspection during manufacture
- 4E Inspection during erection
- 4F Conditions precedent for repairing boiler and boiler component
- 5 Chief Inspector, Deputy Chief Inspectors and Inspectors
- 6 Prohibition of use of unregistered or uncertified boiler
- 7 Registration
- 8 Renewal of certificate
- 9 Provisional orders
- 10 Use of boiler pending grant of certificate
- 11 Revocation of certificate or provisional order
- 12 Alterations and renewals to boilers
- 13 Alterations and renewals to steam-pipes
- 14 Duty of owner at examination
- 15 Production of certificates, etc
- 16 Transfer of certificates, etc
- 17 Powers of entry
- 18 Report of accidents
- 19 Appeals to Chief Inspector
- 20 Appeals to appellate authority
- 20A Power of Central Government to revise order of appellate authority
- 21 Finality of orders
- 22 Minor penalties
- 23 Penalties for illegal use of boiler
- 24 Other penalties
- 25 Penalty for tampering with register mark
- 26 Limitation and previous sanction for prosecutions
- 27 Trial of offences
- 27A Central Boilers Board
- 28 Power to make regulations
- 28A Power of Central Government to make rules
- 29 Power to make rules
- 30 Penalty for breach of rules
- 31 Publication of regulations and rules
- 31A Power of Central Government to give directions
- 32 Recovery of fees, etc
- 33 Applicability to the Government
- 34 Exemptions
- 35 [Repealed.]