7Registration
(1) The owner of any boiler which is not registered under the provisions of this Act 1[may apply to the Inspector along with such other documents as may be prescribed by regulations to have the boiler registered]. Every such application shall be accompanied by the prescribed fee.
(2) On receipt of an application under sub-section (1), the Inspector shall fix a date, within thirty days or such shorter period as may be prescribed from the date of the receipt, for the examination of the boiler and shall give the owner thereof not less than ten days notice of the date so fixed.
2[(3) On the said date the Inspector shall inspect the boiler with a view to satisfying himself that the boiler has not suffered any damage during its transit from the place or manufacture to the site of erection and forward a report of the inspection along with the documents to the Chief Inspector within seven days.
(4) The Chief Inspector, on receipt of the report, may--
(a) register the boiler and assign a register number thereto either forthwith or after satisfying himself that any structural alteration, addition or renewal which he may deem necessary has been made in or to the boiler or any steam-pipe attached thereto, or
(b) refuse to register the boiler:
Provided that where the Chief Inspector refuses to register a boiler, he shall forthwith communicate his refusal to the owner of the boiler together with the reasons therefor.
(5) The Chief Inspector shall, on registering the boiler, order the issue to the owner of a certificate in the prescribed form authorizing the use of the boiler for a period not exceeding twelve months at a pressure not exceeding such maximum pressure as he thinks fit and as is in accordance with the regulations made under this Act:
3[Provided that a certificate issued under this sub-section in respect of an economizer 4[or of an unfired boiler which forms an integral part of a processing plant in which steam is generated solely by the use of oil, asphalt or bitumen as a heating medium] may authorise its use for a period not exceeding twenty-four months.]
(6) The Inspector shall forthwith convey to the owner of the boiler the orders of the Chief Inspector and shall in accordance therewith issue to the owner any certificate of which the issue has been ordered, and, where the boiler has been registered, the owner shall within the prescribed period cause the register number to be permanently marked thereon in the prescribed manner.
Download our fully-offline, High speed android app.- Click here
1. Subs. by Act 49 of 2007, s. 8, for "may apply to the Inspector to have the boiler registered" (w.e.f. 7-10-2010).
2. Subs. by s. 8, ibid., for sub-section (3) (w.e.f. 27-5-2008).
3. Added by Act 34 of 1947, s. 4
4. Ins. by Act 18 of 1960, s. 7.
- 1 Short title, extent and commencement
- 2 Definitions
- 2A Application of Act to feed-pipes
- 2B Application of Act to economisers
- 3 Limitation of Application
- 4 Power to limit extent
- 4A Technical Adviser
- 4B Welders certificate
- 4C Conditions precedent for manufacture of boiler land boiler componen
- 4D Inspection during manufacture
- 4E Inspection during erection
- 4F Conditions precedent for repairing boiler and boiler component
- 5 Chief Inspector, Deputy Chief Inspectors and Inspectors
- 6 Prohibition of use of unregistered or uncertified boiler
- 7 Registration
- 8 Renewal of certificate
- 9 Provisional orders
- 10 Use of boiler pending grant of certificate
- 11 Revocation of certificate or provisional order
- 12 Alterations and renewals to boilers
- 13 Alterations and renewals to steam-pipes
- 14 Duty of owner at examination
- 15 Production of certificates, etc
- 16 Transfer of certificates, etc
- 17 Powers of entry
- 18 Report of accidents
- 19 Appeals to Chief Inspector
- 20 Appeals to appellate authority
- 20A Power of Central Government to revise order of appellate authority
- 21 Finality of orders
- 22 Minor penalties
- 23 Penalties for illegal use of boiler
- 24 Other penalties
- 25 Penalty for tampering with register mark
- 26 Limitation and previous sanction for prosecutions
- 27 Trial of offences
- 27A Central Boilers Board
- 28 Power to make regulations
- 28A Power of Central Government to make rules
- 29 Power to make rules
- 30 Penalty for breach of rules
- 31 Publication of regulations and rules
- 31A Power of Central Government to give directions
- 32 Recovery of fees, etc
- 33 Applicability to the Government
- 34 Exemptions
- 35 [Repealed.]