245Period for completion of building
A Board, when sanctioning the erection or re-erection of a building as hereinbefore provided, shall specify a reasonable period after the work has commenced within which the erection or re-erection is to be completed, and, if the erection or re-erection is not completed within the period so fixed, it shall not be continued thereafter without fresh sanction obtained in the manner hereinbefore provided, unless the Board on application made therefor has allowed an extension of that period:
Provided that not more than two such extensions, each for not more than one year, shall be allowed in any case
Download our fully-offline, High speed android app.- Click here
TOWN PLANNING AND CONTROL OVER BUILDING, ETC.
- 233 Preparation of land use plan
- 234 Sanction for building
- 235 Notice of new buildings
- 236 Conditions of valid notice
- 237 Powers of Board under certain sections exercisable by Chief Executive Officer
- 238 Power of Board to sanction or refuse
- 239 Order of stoppage of building or works in certain cases and disposal of things removed
- 240 Power to sanction general scheme for prevention of overcrowding, etc
- 241 Compensation
- 242 Completion notice
- 243 Lapse of sanction
- 244 Restrictions on use of buildings
- 245 Period for completion of building
- 246 Completion certificate
- 247 Illegal erection and re-erection
- 248 Power to stop erection or re-erection or to demolish
- 249 Power to seal unauthorised constructions
- 250 Courts not to entertain proceedings in certain cases
- 251 Power to make bye-laws
- 252 Prohibition of structures or fixtures which cause obstruction in streets
- 253 Unauthorised buildings over drains, etc
- 254 Drainage and sewer connections
- 255 Power to attach brackets for lamps and other accessories
- 256 Maintenance of Roads