Every application to be made under section 6 shall include,- (a) a description of the undertaking and of the route to be followed by the proposed aerial ropeway; (b) a description of the system of construction and management and of the advantages to the community to be expected from such ropeway; (c) an estimate of the cost of construction thereof; (d) a statement of the estimated working expenses and profits in respect thereof; (e) a statement of the maximum and minimum rates which it is proposed to charge; (f) such maps, plans, sections and drawings in connection therewith as the State Government may require in order to form an idea of the proposal.
<span style="margin-left:15px;"></span>Every application to be made under section 6 shall include,-<br> <span style="margin-left:15px;"></span><span style="margin-left:15px;"></span>(<i>a</i>) a description of the undertaking and of the route to be followed by the proposed aerial ropeway;<br> <span style="margin-left:15px;"></span><span style="margin-left:15px;"></span><i>(b)</i> a description of the system of construction and management and of the advantages to the community to be expected from such ropeway;<br> <span style="margin-left:15px;"></span><span style="margin-left:15px;"></span>(<i>c</i>) an estimate of the cost of construction thereof;<br> <span style="margin-left:15px;"></span><span style="margin-left:15px;"></span>(<i>d</i>) a statement of the estimated working expenses and profits in respect thereof;<br> <span style="margin-left:15px;"></span><span style="margin-left:15px;"></span>(<i>e</i>) a statement of the maximum and minimum rates which it is proposed to charge;<br> <span style="margin-left:15px;"></span><span style="margin-left:15px;"></span>(<i>f</i>) such maps, plans, sections and drawings in connection therewith as the State Government may require in order to form an idea of the proposal.<br>