Lawgist logo - L! Lawgist.
The Electricity Act

32Functions of State Load Despatch Centres

(1) The State Load Despatch Centre shall be the apex body to ensure integrated operation of the power system in a State.

(2) The State Load Despatch Centre shall--

(a) be responsible for optimum scheduling and despatch of electricity within a State, in accordance with the contracts entered into with the licensees or the generating companies operating in that State;

(b) monitor grid operations;

(c) keep accounts of the quantity of electricity transmitted through the State grid;

(d) exercise supervision and control over the intra-State transmission system; and

(e) be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the State Grid Code.

(3) The State Load Despatch Centre may levy and collect such fee and charges from the generating companies and licensees engaged in intra-State transmission of electricity as may be specified by the State Commission.

Download our fully-offline, High speed android app.- Click here

Download the App Now!

Get our Android app for fast and offline Access.

Get it on Google Play
Lawgist is not a law firm and does not engage in the practice of law or provide legal advice or legal representation. All information, software, services, and comments provided on this site are for informational and self-help purposes only and are not intended to be a substitute for professional legal advice. Use of this site is subject to our Terms and Conditions, Disclaimer, and Privacy Policy.About Us Made in ♥ with India, Internet and Lots of Courtroom Dramas